Guides / Bid/no-bid / Requalify at pricing

Requalify at pricing

Re-qualifying at pricing: what changed since the first bid decision?


Compare current scope, margin, capacity, contract qualifications and evidence with the week-one bid record, and name who can clear each change. Hours already spent are not a reason to continue. This is the second gate in the bid/no-bid decision guide.

Published: 16 September 2026 · By Andre · Reviewed by Bill · selrob

Takeaways

  • The first bid call expires when scope, margin, capacity, qualifications or evidence move.
  • Write the delta. Name who can clear each change. A mood in the bid room is not a record.
  • Hours already spent are sunk. Re-score as if they had not been spent.
  • Approve, review or withdraw. Starting the price file is not a fourth option.

What is re-qualification at pricing?

It is a second bid/no-bid call, made when the price file is being built, against the same three axes as week one. The question is not “are we still enthusiastic.” It is “what changed since we said bid, and who is allowed to accept that change.”

Week one is often a conditional yes: named lead, assumed margin, assumed volumes, a qualification the firm intends to put in the offer. Pricing is where those conditions meet a workbook, an addendum and a roster that has moved. If you do not re-open the call, the condition has been waived by silence.

What do you compare?

Five fields, initial versus current. Scope: what the pack now requires you to deliver, including addenda. Margin: the delivery-floor price against any price-to-win figure now on the table; the arithmetic lives on price to win versus price to deliver, and the quantities live in the pricing schedule. Capacity: named people and the delivery window if you win. Contract qualifications: what you planned to mark as a departure, and what the pack or a clarification now does with that mark. Evidence: certificates, insurance, clearances and case studies that must still be true at close.

Anything that cannot be named in those five fields is not a delta. It is commentary.

Who can clear each change?

Use the same authority as the first gate. BD owns the recommendation. Delivery vetoes capacity. Finance vetoes risk. The managing director is accountable for the recorded call. The person building the price file prepares the delta. They do not vote it through.

A change without an owner is already a review. “We will sort the lead next week” is not a clearance. Clearance is a named person, a dated fact, and a signature on the record below.

What about the hours already spent?

They are sunk. Re-score as if they had not been spent. That is the whole of the zombie-bid test, applied at the price file rather than at the first draft. Finishing a tender because the estimate is half done is how a no-bid becomes a submission.

A qualification layer such as selrob is useful here only if the first call was written down. Without that record, pricing has nothing to compare and the second gate becomes another conversation.

Blank template

Blank decision-delta worksheet

Decision-delta worksheet, blank form
Change ID Axis At first bid Now Who can clear Path Evidence / next fact
D-01 Scope     Delivery Review  
D-02 Margin     Finance Review  
D-03 Capacity     Delivery Review  
D-04 Contract qualification     Finance Review  
D-05 Evidence     BD Review  

Version 1.0, September 2026. Path is Approve, Review or Withdraw. Hours already spent are not a row.

Worked example

Completed example: Western Ranges hard FM

Hypothetical. The buyer, tender and figures are invented to show the fields in use; they are not a client result. Figures match the pricing-schedule and price-to-win examples: annual comparison total $224,300 at the delivery-floor rates; BD’s price-to-win input $205,000.

Decision-delta worksheet, completed hypothetical example
Change ID Axis At first bid Now Who can clear Path Evidence / next fact
D-01 Scope 8 Sep 2026. PPM lump plus indicative reactive. No after-hours Priority 1 KPI. Addendum 02: after-hours Priority 1 attendance within 2 hours. Abatement $2,500 per event. No cap in the KPI schedule. Finance Review Clarification logged: is abatement capped, and does it stack with delay damages.
D-02 Margin Delivery-floor comparison $224,300 a year; 10.4 percent net margin on the named cost stack. BD input $205,000 comparison total by cutting the lump to $136,700. Net margin 2.0 percent at base volumes; 1.0 percent if indicative SOR runs 30 percent light. Finance Withdraw if PTW stands Hold the delivery-floor rates, or withdraw. Do not split the difference in the workbook.
D-03 Capacity Named lead Samira free from 1 Nov 2026. 1.2 FTE. Samira assigned to an awarded job through February 2027. No deputy named. Delivery Review Deputy named by Friday 18 Sep 2026, or this row is a no.
D-04 Contract qualification Statement of departures on uncapped consequential loss. BD treated it as negotiable. Buyer clarification: a departure on that clause will be evaluated as non-conforming for the clause. Finance / MD Withdraw unless MD accepts the clause Pack rule controls. Internal hope does not.
D-05 Evidence ISO 45001 current. $20 million public liability held. ISO 45001 expires 30 Nov 2026. Recertification audit booked 12 Nov. Mobilisation assumed December. BD Review Dated path only. If 12 Nov slips, the call is no without another meeting.

What do approval, review and withdrawal look like?

Hypothetical. The buyer, tender and figures are invented to show the fields in use; they are not a client result. Three paths from the same Western Ranges delta. The hours already on the file are 38. They do not appear in the tests.

  • Approval. Addendum 02 comes back capped at 5 percent of the monthly lump and does not stack with delay damages. Delivery names a deputy with diary space from 1 November. Recertification stays on 12 November. Finance rejects the $205,000 input and holds $224,300. BD recommends bid. MD records bid, dated, with those four facts as conditions. If any condition fails before close, the call re-opens.
  • Review. The table above. Finance has 48 hours on the uncapped abatement. Delivery has until Friday to name the deputy. BD may not lodge, and may not keep building the price file as if the answer were yes. Review is a dated ticket, not a quiet continuation.
  • Withdrawal. The $205,000 input stands, the consequential-loss departure is non-conforming, and no deputy exists. BD recommends no-bid. MD records no-bid the same day. The estimate is not finished “so the work is not wasted.” That sentence is the zombie.

Minimal record

Record the updated call before more effort

Hypothetical. The buyer, tender and figures are invented to show the fields in use; they are not a client result. One row. The recommendation is not the call until the MD line is filled.

Minimal re-qualification record, completed hypothetical example
Opportunity First call Re-qual date BD recommendation Delivery Finance MD recorded call Conditions / next check
WRHD-FM-2026 8 Sep 2026. Bid, conditional on Samira and 10 percent net. 16 Sep 2026 Review, then no-bid if D-02, D-03 or D-04 uncleared Veto pending deputy by 18 Sep 2026 Veto on $205,000 PTW and uncapped abatement Review. Not a bid. Re-open 18 Sep 2026. 38 hours spent are not a criterion.