Guides / Bid/no-bid / New markets

New markets

Every assumption from home needs re-evidence abroad. Price the re-evidence.


A new sector or country voids the evidence your gate runs on: referees, regime knowledge, delivery presence, cost base. List what needs fresh proof, what it costs, and whether this tender may carry it. Part of our guide on the bid/no-bid decision.

Published: 16 September 2026 · By Andre · Reviewed by Bill · selrob

Takeaways

  • Five assumption families fail on entry: regime, evidence, presence, cost, and relationships.
  • Fresh evidence has a price (registration, presence, partnerships, learning bids) costed before the gate.
  • Hypothetical entry scenario below, labelled, with no invented win probabilities.

Which assumptions need fresh evidence?

Market-entry assumption, evidence needed, source, cost and capacity effect
Assumption from home Fresh evidence needed Source Cost / capacity effect
We know the rules Regime map for the new market NZ pillar, UK pillar, three-way comparison Reading weeks, not hours, plus counsel where it matters
Our referees prove us Locally legible references First small wins, partnerships, or transferable multinational proof Early bids score lower until the record exists
We can deliver there Presence, mobilisation, local supply chain Site visits, partner diligence, mobilisation quotes Travel, setup, and management overhead before revenue
Our costs transfer Local cost base: labour, compliance, insurance, tax Brokers, accountants, local hires Rebuilt pricing from zero; home rates mislead
We know the buyers Relationship and reputation from nothing Panels, small lots, visible delivery, time Longest payback of all; budget years, not tenders

Jurisdiction claims in the regime row defer to the verified pillars; this page owns the commercial entry decision, not the rules. The three-axis test still frames it: strategy, capacity, risk.

A labelled hypothetical

Hypothetical, invented to show the worksheet, not a client case and with no win probabilities attached. An Australian professional-services firm eyes its first New Zealand tender: a mid-value departmental RFP in its discipline. Regime reading: two weeks of partner time against the NZ pillar. Referees: strong Australian proof, zero NZ proof, scored honestly at a discount. Presence: fly-in delivery with a local partner to be found and diligenced. Cost base: rebuilt with NZ labour and compliance inputs. Verdict: a review, not a bid; proceed only with a partner signed and the learning priced as market entry, not as pursuit.

What does this mean for the bid/no-bid call?

Entry bids are investments wearing tender numbers: gate them as investments, with entry cost, payback horizon, and kill criteria agreed before lodgement. A single tender that cannot carry the entry cost is a no, however attractive the scope. The firm enters markets; tenders merely timestamp the decision.

Keep reading

Elsewhere in this guide.

Book a call

Bring the last tender you regretted.

In 30 minutes we’ll show you the call selrob would have made, and the working behind it.