Guides / Software / Data portability

Data portability

Test the exit before you sign the entrance. Untested here, testable by you.


Decisions, sources, and reusable content locked in a tool you leave are assets stranded; run a sample export-and-reimport test during trial, check the contract’s exit terms, and price the exit before adopting. Status: untested by us; the test below is yours to run. Part of our guide on bid and tender software.

Published: 16 September 2026 · By Bill · Reviewed by Andre · selrob

Takeaways

  • Export decisions with evidence pointers, sources with locations, and content with version history, or they do not survive exit.
  • Contract terms decide notice periods, export assistance, deletion, and fees; read before trial ends.
  • Qualification alternatives stay on qualification vs response; confidentiality on security and confidentiality.

What does the sample export test cover?

Sample export test: asset, export check, reimport check
Asset Export check Reimport check
Decision records with evidence pointers Full history exports with timestamps and versions intact Pointers resolve in the target system, not as dead text
Source documents and locations Files plus their pack locations and addendum versions Re-linked to equivalent locations, verified by spot check
Reusable content with history Content plus approval status, owner, and version trail Editable in the target: not flattened exports that cannot be maintained

Run this on a trial account with real-shaped data before signing: export everything, reimport into the alternative, including a return to spreadsheets, and score what survived. Document the result with a date; vendor export documentation and contract terms are the other two legs. No sample test was run by us for any vendor, stated plainly, as the evidence route requires.

What does the contract say about leaving?

Notice periods, export assistance duties and fees, data-deletion timelines, and post-termination access; read together, before the trial converts. An exit that costs three months’ fees plus a paid export project changes the adoption arithmetic: add it to the pilot’s evidence alongside the 30-day pilot results. Where the qualification record should live long-term is a design question (CRM and bid software) and data-handling duties during use are on data handling.

What does this mean for the bid/no-bid call?

Nothing directly, and everything structurally: a gate whose history cannot leave its tooling is a hostage, not a process. Design for export on day one, test it before renewal, and keep a spreadsheet-readable copy of every decision regardless of platform.

Keep reading

Elsewhere in this guide.

Book a call

Bring the last tender you regretted.

In 30 minutes we’ll show you the call selrob would have made, and the working behind it.