Which pursuits consume next month’s bid and delivery capacity?
Read the register, not a slide. Count open rows. Age them from receipt, or from a dated stage change if you have one. Sum planned hours still sitting on those rows, and actual hours already spent. List close dates inside the next thirty days. Overlay delivery windows on work already committed. Blank decision date means pending, not missing. A no-bid with a dash in the delivery window is excluded from overlap, not treated as a hole in the data.
The sample below is the worked example on the pipeline register, as at 16 September 2026: OPP-104 submitted 56 planned / 61 actual; OPP-107 in gate 40 / 6; OPP-101 no-bid 8 / 5; OPP-098 lost 48 / 52. Open planned hours = 96. This page reports. That page is data entry.