Forty hours is a floor. Cost it before the draft exists.


A tender response costs 40 hours at the floor (bid lead, specialists, partner, external) and the hours are gone whether you win or lose. The calculator below prices your own pursuit; the method sits under the economics of bidding. What a 20 percent cut in poor-fit work returns is on qualification ROI.

Published: 2 September 2026 · By Andre · Reviewed by Bill · selrob

Takeaways

  • Defaults: 20h at $180, 16h at $220, 4h at $350, external $0. That is 40 hours and $8,520.
  • Include everyone who touches the response, at the rate they would otherwise bill or cost.
  • Cost if lost equals cost. Winning does not refund the week.
  • The figure is a default you can cite, not a client result.

What is the methodology?

Hours times rate, summed, plus external. Bid lead is the person who owns the response. Specialists are anyone pulled off live work to write, price, or review. Partner is the sign-off. External is legal, graphics, modelling, a translator: cash that leaves the firm.

Rates are loaded cost or billing rate, whichever you actually lose. A consultancy that would have billed the principal should use the billing rate. A contractor whose people are on salary should use loaded cost. Mixing the two in one row is how the number gets argued instead of used.

Defaults are a conservative Australian professional-services floor for a mid-size pursuit, not a survey. Defence volumes, multi-state facilities, and consortium responses run higher. An RFQ under a panel can run lower. If your last five sit well above forty hours, believe your diary.

The output is hours, pursuit cost, and cost if lost. Cost if lost equals pursuit cost. There is no expected-value row. Win probability is how firms hide a no-bid inside a maybe. Cost the hours. Then make the bid/no-bid call on fit, not on a discounted fee.

Cost it

Hours, rates, external.

Defaults are filled. Change them. Print or save as PDF when you are done.

What the number cannot do

It cannot tell you whether to bid. A cheap pursuit that fails risk is still a no. An expensive pursuit that passes all three axes can still be a yes. Cost is the reason to run the gate, not a substitute for it.

It cannot recover hours you have already spent. If the draft exists, you are costing a zombie. Put the number on the next inbound, in week one, before a template opens.

Keep reading

Elsewhere in this guide.

Questions

Worth answering before you close the tab.

How much does a proposal cost?

At the published defaults, 40 hours and $8,520: bid lead 20 hours at $180, specialists 16 hours at $220, partner 4 hours at $350. Change the inputs to your rates.

What should you include in pursuit cost?

Everyone who touches the response, at the rate they would otherwise bill or cost, plus external (legal, graphics, modelling). Do not leave the principals out because they do not fill a timesheet.

Is the $8,520 a client result?

No. It is a citable default from published hours and rates. Your last bid may be higher. Defence volumes and consortium responses usually are.